Projects

Duration or Year of Completion Assignment name/& brief description of main
deliverables/outputs

Name of Client &
Country of Assignment
Role on the Assignment
2005 PMP East Azarbayejan regional water corporation Engineering
2005 PMP, PMF studying of vanyar dam with sinoptic method East Azarbayejan regional water corporation Engineering
2004 Study of preparation of vanyar dam reservoir East Azarbayejan regional water corporation Engineering
2006 Study of Vanyar dam induction earthquake East Azarbayejan regional water corporation Engineering
2008 Study of environmental impact assessment of Agi-chai salinity control structures East Azarbayejan regional water corporation Engineering
2010 Review of hydrology and water resources management studies of aurbatan reservoir dam East Azarbayejan regional water corporation Engineering
1998 Study of phase 1 of Hafshejan dam and irrigation Char mahal o bakhtiari regional water corporation Engineering
1999 Study of phase 2 of Tajyar dam & social study of Tajyar downstream lands East Azarbayejan regional water corporation Engineering
2000 Site supervision on construction of Tajyar dam East Azarbayejan regional water corporation Engineering
2000 top supervision on construction of Tajyar dam East Azarbayejan regional water corporation Engineering
2006 site supervision on construction of Tajyar main irrigation East Azarbayejan regional water corporation Engineering
2006 top supervision on construction of Tajyar main irrigation East Azarbayejan regional water corporation Engineering
1999 Study of phase 2 of using Tabriz refined waste water East Azarbayejan regional water corporation Engineering
1999 Site supervision on construction of vanyar dam East Azarbayejan regional water corporation Engineering
top supervision on construction of vanyar dam East Azarbayejan regional water corporation Engineering
2004 Top supervision on hydro-mechanical and electrical vanyar dam East Azarbayejan regional water corporation Engineering
2000 Study of phase 1 of Tajyar irrigation network. East Azarbayejan regional water corporation Engineering
2001 Study of phase 2 of Aghbolagh dam Char mahal o bakhtiari regional water corporation Engineering
2008 Supervision on geotechnical operation of Aghbolagh project-3 Char mahal o bakhtiari regional water corporation Engineering
2008 Study of environmental impact assessment of Aghbolagh dam and irrigation & drainage network Char mahal o bakhtiari regional water corporation Engineering
2012 Detail design studies & updating of phase 2 of Aghbolagh dam and irrigation & drainage network Char mahal o bakhtiari regional water corporation Engineering
2001 Supervision on geotechnical operation of Aghbolagh project-2 Char mahal o bakhtiari regional water corporation Engineering
2002 Study of phase 2 Cheshme Zane dam and irrigation network Char mahal o bakhtiari regional water corporation Engineering
2005 Social study and the exploitation system of popular participation for the construction of Cheshme Zaneh dam and irrigation network Char mahal o bakhtiari regional water corporation Engineering
2004 site supervision on construction of Cheshme zane dam Char mahal o bakhtiari regional water corporation Engineering
2004 top supervision on construction of Cheshme zane dam Char mahal o bakhtiari regional water corporation Engineering
2004 Study of justification phase of irrigation and drainage network of Talug dam downstream lands. Khuzestan water & power authority Engineering
2004 Study of phase 1 of Talug dam. Khuzestan water & power authority Engineering
2004 Supervision on geotechnical operation of Talug project. Khuzestan water & power authority Engineering
2005 Environmental study of Sardasht dam. Khuzestan water & power authority Engineering
2005 Environmental study of Shirinab dam. Khuzestan water & power authority Engineering
2005 PMP and PMF studies, of Talug and Sardasht dams with sin optic method Khuzestan water & power authority Engineering
2004 Reviewing study of phase 1 (pre- justification) of seydun 1,2,3 dams and power plants Khuzestan water & power authority Engineering
2010 Lateral services for reviewing study of phase 1 (pre- justification) & 2 of seydun 1,2,3 dams and power plants(Supervision on geotechnical operation) Khuzestan water & power authority Engineering
2005 Semi-detailed study of ground water resources in Gheydar and Nowbaran plains Tehran regional water corporation Engineering
2005 Study of phase 1 and 2 of Shahrab diversion dam and study of phase of 2 of Ostuh and Gazoran diversion dam and water transmission channel Markazi convince water affairs office Engineering
2005 Environmental study for Zanjan 5oo M.W gas power plants site with BOO Method. Zanjan regional power company Engineering
Reviewing procedures of economical evaluation of water resources development projects technical criteria and standard office of power ministry Engineering
2006 Energy management strategic study of water and waste water industry of country country water and waste water company Engineering
2006 Study of Aghbolagh basin water resources planning and its economical studies Char mahal o bakhtiari regional water corporation Engineering
2006 Justification and cognition study of drainage & irrigation network of Aghbolagh downstream lands Char mahal o bakhtiari regional water corporation Engineering
2007 Study of soil resources analysis of Aghbolagh downstream lands Char mahal o bakhtiari regional water corporation Engineering
2006 study of drainage & irrigation network of Aghbolagh downstream lands(phase 3 &4 of network) Char mahal o bakhtiari regional water corporation Engineering
2010 Social study and the exploitation system of popular participation for the phase 1 of Aghbolagh drainage & irrigation network. Char mahal o bakhtiari regional water corporation Engineering
2010 Study of damage of Aghbolagh dam reservoir Char mahal o bakhtiari regional water corporation Engineering
2006 Social study and the exploitation system of popular participation for the phase 1 of Aghbolagh reservoir dam. Char mahal o bakhtiari regional water corporation Engineering
2009 Exact semi-detailed pedology studies of Bermanak irrigation and drainage network Qazvin regional water corporation Engineering
2009 Performing quality experiments of environmental studies of Bermanak dam & irrigation and drainage network Qazvin regional water corporation Engineering
2008 Surveying and designing of Water Transmission Pipe Line Of Ghadir Iranian Direct Reclamation Bita tarhe no avar engineering company Engineering
2008 Taking census of surface and underground water resources and semi-detailed studies of underground water of 12 studied regions of Kermanshah province Kermanshah regional water corporation Engineering
2008 Taking census of surface and underground water resources of studied regions of Qom province Qom regional water corporation Engineering
2008 Performing quality control experiments which are required for weakest water and water in Alborz township limits Qazvin regional water corporation Engineering
2008 Studies of recognition phase of Tangezi dam and power plant project Char mahal o bakhtiari regional water corporation Engineering
2008 Studies of first phase of longtime water providing and transmitting of Laran division in Shahre Kord Char mahal o bakhtiari regional water corporation Engineering
2008 Providing tender documents and calling for low bids of collecting surface waters of region 3 of Tehran 21st distinct Khakriz Ab company Engineering
2009 Studies of reviewing recognition phase and studies of first phase of Agi soo dam Golestan regional water corporation Engineering
2010 Supervision on geotechnical operation,borrow area and experiments of Agi soo dam Golestan regional water corporation Engineering
2009 Study of phase 1 of Chame sorkh & Golal Malek reservoir dams ILam regional water corporation Engineering
2011 Supervision on geotechnical operation,borrow area and experiments of Golal Malek reservoir dam ILam regional water corporation Engineering
2010 Study of phase 1 of namrood to simin dashte garmsar canal water transmission line Semnan regional water corporation Engineering
2010 Consulting engineering services(phase 1 & 2) of mashhad prison Ministry of Roads and Urban Development Engineering
2010 Consulting engineering services(phase 1 & 2) of shiraz prison Ministry of Roads and Urban Development Engineering
2010 Consulting engineering services(phase 1 & 2) of ahvaz prison Ministry of Roads and Urban Development Engineering
2012 Consulting engineering services(site supervision) of ahvaz prison Ministry of Roads and Urban Development Engineering
2012 Consulting engineering services(top supervision) of ahvaz prison Ministry of Roads and Urban Development Engineering
2010 Environmental study of asadieh dam (Study of phase 2) South khorasan regional water corporation Engineering
2010 Documentation of sefid rood dam Gilan regional water corporation Engineering
2011 Study of phase 1 of Dikdash dam & Irrigation & Drainage network Ardebil regional water corporation Engineering
2006 Study of flood of Khoram Abad gas power plant. Khoram abad Movaled niroo company Engineering
2012 Engineering services to control flood of Khoram Abad combined cycle power plant Khoram abad Movaled niroo company Engineering
2007 Designing of Khesus menandez water treatment plant(In Cuba) Sanir company Engineering
2006 Study of phase 2 of Sardasht reservoir dam Khuzestan water & power authority Engineering
2006 Environmental study of Sardasht dam (Study of phase 2) Khuzestan water & power authority Engineering
2007 Supervision on geotechnical operation of Sardasht reservoir dam Khuzestan water & power authority Engineering
2012 Passive defense study of SArdasht reservoir dam Khuzestan water & power authority Engineering
2012 Studying and modeling of water quality of Sardasht dam Khuzestan water & power authority Engineering
2013 Site supervision on construction of Sardasht dam Khuzestan water & power authority Engineering
2013 top supervision on construction of Sardasht dam Khuzestan water & power authority Engineering
2006 Study of phase 2 of Shirin ab reservoir dam Khuzestan water & power authority Engineering
2006 Environmental study of Shirin ab dam (Study of phase 2) Khuzestan water & power authority Engineering
2007 Supervision on geotechnical operation of Shirin ab reservoir dam Khuzestan water & power authority Engineering
2012 Passive defense study of Shirin ab reservoir dam Khuzestan water & power authority Engineering
2013 Site supervision on construction of Shirin ab dam Khuzestan water & power authority Engineering
2013 top supervision on construction of Shirin ab dam Khuzestan water & power authority Engineering
2007 Semi- detailed study of underground water of mountains and aquifers of Ramsar- Chalus and Noshahr- Noor plains Mazandaran regional water corporation Engineering
2007 Lateral services of complementary studies of reservoir damages & economically situation for kharaji dam and irrigation project Char mahal o bakhtiari regional water corporation Engineering
2007 Studying the corporation establishment of Water users in underground and composed water in eastern west plain of Tehran convince (Varamin) Tehran regional water corporation Engineering
2007 Study of environmental impact assessment of Shanol,homa and varavi projects Iran oil national company Engineering
2008 Study of environmental impact assessment of Balakhanlu irrigation and drainage network Qazvin regional water corporation Engineering
2009 Performing quality experiments of environmental studies of Balakhanlu irrigation and drainage network: Qazvin regional water corporation Engineering
2008 Study Of Phase 1 Of Irrigation And Drainage Network Of Bermanak Reservoir Dam Qazvin regional water corporation Engineering
2008 Study of environmental impact assessment of Bermanak dam and irrigation network Qazvin regional water corporation Engineering
1995 supervision on lamination and experimental operations and modifying lands of Tabriz and Sarab plain East Azarbayejan regional water corporation Engineering
1994 Study of phase 1 of the Roodbar Dam and power plant in Lorestan province. Iran water and power resources development company Engineering
1994 Supervision on access roads and geotechnical operation of Roodbar project Iran water and power resources development company Engineering
1994 Study of Aji Chai basin project East Azarbayejan regional water corporation Engineering
1995 Study of phase 1 of Aghbolagh dam, Pumping and transmission. Char mahal o bakhtiari regional water corporation Engineering
1995 Study of phase 1 of Kharaji dam Char mahal o bakhtiari regional water corporation Engineering
1995 Study of 2nd and 3rd phases of Vanyar diversion tunnels and water transmission , access roads and residential camp East Azarbayejan regional water corporation Engineering
1994 Supervision on geotechnical & geophysical operation of Vanyar project East Azarbayejan regional water corporation Engineering
1996 Supervision on geotechnical & geophysical operation of Kharaji project. Char mahal o bakhtiari regional water corporation Engineering
1996 Supervision on geotechnical & geophysical operation of Aghbolagh project-1 Char mahal o bakhtiari regional water corporation Engineering
1995 supervision on operation of Vanyar tunnels East Azarbayejan regional water corporation Engineering
1996 reading, water sampling and supervising on observed wells in Tabriz and sarab plains East Azarbayejan regional water corporation Engineering
1996 Small hydro power plants project Iran water and power resources development company Engineering
1997 Twelve small power plants project (related to Zayande rud) Iran water and power resources development company Engineering
1996 Study of phase 1of Beheshtabad dam and power plant. Esfehan regional water corporation Engineering
1999 Study of improving the quality of water resources of Aji-Chai and quality control of water & soil of Tabriz plain East Azarbayejan regional water corporation Engineering
1999 Study of phase 1 (pre- justification study) of Bazoft dam and power plant. Iran water and power resources development company Engineering
2000 Study of phase 1( justification study) of Bazoft dam and power plant. Iran water and power resources development company Engineering
2000 Study of access roads and surveying services of Bazoft dam and power plant Iran water and power resources development company Engineering
1998 Study of phase 2 of vanyar dam East Azarbayejan regional water corporation Engineering
2004 Vanyar dam architectural studies of iirigation tower East Azarbayejan regional water corporation Engineering
2011 Necessary engineering services for intaking of vanyar dam East Azarbayejan regional water corporation Engineering
2005 Study of reviewing meteorology , hydrology and water resources of Vanyar dam East Azarbayejan regional water corporation Engineering
2010 Complementary studies of second phase of Cheshmezaneh dam and irrigation and drainage network Char mahal o bakhtiari regional water corporation Engineering
2002 Study of Roodbar Lorestan phase 1 review Iran water and power resources development company Engineering
2002 Supervision on geotechnical and access roads operation of Bazoft dam and power plant Iran water and power resources development company Engineering
2001 Study for discovering ground water resources in Semnan desert. Tehran regional water corporation Engineering
2002 Qualitative study of pollution in Arak desert. Tehran regional water corporation Engineering
2002 Study of evaluation of environmental effects of vanyar dam East Azarbayejan regional water corporation Engineering
2002 Energetic study of the environment of the Islamic Republic of Iran (EER) Electrowat company Engineering
2002 Taking census of water resources in studied areas of Gilan Regional water corporation Gilan regional water corporation Engineering
2003 Study of phase 1 & Social Study and supervision on water right of Koshksaray reservoir dam East Azarbayejan regional water corporation Engineering
2004 Supervision on geotechnical operation of Koshksary project. East Azarbayejan regional water corporation Engineering
2003 Study of phase 2 of Tajyar irrigation network. East Azarbayejan regional water corporation Engineering
2002 Environmental study of transmission of water from Ruziyeh spring to Semnan. Tehran regional water corporation Engineering
2002 Updating the atlas of water resources and setting up a geographical information system (GIS) of the basin of Gorganrood & Ghrehsoo rivers Golestan regional water corporation Engineering
2003 Taking census of water resources and underground and surface water consumptions in Markazi province water affairs. Tehran regional water corporation Engineering
2002 Study of phase 2 Roodbar dam and power plant in Lorestan province Iran water and power resources development company Engineering
2003 Study of phase 1 (preliminary study) of Sardasht dam. Khuzestan water & power authority Engineering
2003 Taking census of surface and underground water resources and in plains of Ghaemshahr, Juybar, Amol and Babol Mazandaran regional water corporation Engineering
2004 site supervision on construction of the Roodbar dam and power plant in Lorestan province Iran water and power resources development company Engineering
2004 site supervision on construction of the Roodbar dam and power plant in Lorestan province Iran water and power resources development company Engineering
2003 Semi-detailed study of ground water resources, utilization management, providing the optimized balance and GIS database for the region under study in Ardebil province East Azarbayejan regional water corporation Engineering
2003 Study of environmental effects of the project of transmission and treatment of water from Mamlu dam to Tehran. Tehran regional water corporation Engineering
2011 site & top supervision on settlements and industrial regions of Markazi Province-region 1 Markazi Province Industrial Regions Company Engineering
2011 site & top supervision on settlements and industrial regions of Markazi Province-region 2 Markazi Province Industrial Regions Company Engineering
2011 site & top supervision on settlements and industrial regions of Markazi Province-region 3 Markazi Province Industrial Regions Company Engineering
2011 site & top supervision on settlements and industrial regions of Tehran Province-period 1 Tehran Province Industrial Regions Company Engineering
2012 site & top supervision on settlements and industrial regions of Tehran Province-period2 Tehran Province Industrial Regions Company Engineering
2013 Studies of water providing and transmitting to takestan gardens and optimum usage from extant water resources Qazvin regional water corporation Engineering
2012 Site supervision on projects of industrial regions of Mazandaran Province Mazandaran Province Industrial Regions Company Engineering
2012 Detail design & studies(phase 2) dam and hydro power plant and Basic design & studies (phase 1) pump storage power plant of khersan 1 Iran water and power resources development company Engineering
2012 site supervision on geotechnical operations of khersan 1 project Iran water and power resources development company Engineering
Study and design (phase 1 & 2) of maragheh prison state prisons and security and corrective measures organization Engineering
2012 forth factor services of municipality of region 4 tehran municipality -region 4 Engineering
2013 site supervision on waste water project of Meshkin shahr water and waste water company of Ardebil Province Engineering
2013 top supervision on waste water project of Meshkin shahr water and waste water company of Ardebil Province Engineering
2013 top supervision on waste water project of Meshkin shahr water and waste water company of Ardebil Province Engineering
2013 Study and design (phase 1&2) of Aligoodarz prison State prisons and security and corrective measures organization Engineering
2013 Study and design (phase 1& 2) of Shooshtar prison State prisons and security and corrective measures organization Engineering
2013 Design and build modules 7 & 8 of waste water treatment in south of Tehran with DBF method Zharf kar jam company Engineering
2013 Study of environmental impact assessment of Sirjan power plant Ahmad Ahrabi gas power plant senior management Engineering
2014 Basic studies(phase 1) of using refined waste water of Ilam, Dare shahr, Dehloran and Mehran treatment plants Ilam regional water corporation Engineering
2014 Basic studies(phase 1) of shiveh dam and hydro power plant and water transmission system Iran water and power resources development company Engineering
2014 Studies of 2nd phase of diversion dam and water transmission line project of Sheshpir-e-Sepidan-Shiraz Fars regional water corporation Engineering
2014 Design and site supervision for the project of planning and construction of on-Farm irrigation and drainage networks, equipping and modernization of construction unit No.1 & 2 of Jofeir lands.   Jahad_e_Naser Hamzeh Engineering
2015 Engineering services for the project of planning and construction of on-Farm irrigation and drainage network in lands of Minoo and Jarf islands. Jahad_e_Naser Tehran Engineering
2015 Studies of phase 1 and 2 of Dehrood dam Bousherhr regional water corporation Engineering
2015 Studies of Foosk dam Kerman regional water corporation Engineering