Duration or Year of Completion Assignment name/& brief description of main
deliverables/outputs

Name of Client &
Country of Assignment
Role on the Assignment
IGAT-V 56" Pipeline Project's Management Contract Iran Gas Engineering and Development Company/IRA Management Contract
IGAT-9 56" Project's Management Contract Iran Gas Engineering and Development Company/IR Management Contract
2013 Supervision on construction and Procurement of Strategic Oil Rreserviors in Mahshahr. National Iranian Oil Product Distribution Company/IR Consultant
2011 Preliminary and detail study, Design and Supervision on Construction of three Storage Tank (330 kgal in vol.) in NEKA. National Iranian Oil Terminals Company/IRAN Consultant
2012 Implementation and Supervision of HSE Systems in the Fifth South Pars Refinery (phases 9 and 10). South Pars Gas Complex /IRAN Consultant
2012 Operation and Engineering Services in the Fourth South Pars Refinery (Phases 6,7 and 8). South Pars Gas Complex /IRAN Consultant
2012 Supervision of BOUSHEHR'S gas Transmission and Network project. National Iranian Gas Company/IRAN Consultant
Supervision on the Construction of IGAT-6 56" Pipeline from Ahwaz to Dehgolan and its Relevant Branches Including the Export Gas Pipeline to Iraq (1000 km in Length) Iran Gas Engineering and Development Company/IRA Consultant
Engineering Consultation and supervision on construction of PATAVEH 4BGCS (PC Project) Iran Gas Engineering and Development Company/IR Consultant
EPC Project of Shahid Mandanizadeh-Bidboland (1) Refinery 42" Sour Gas Pipeline Including Metering and Pressure Control Stations (In JV with Iran Arvin). Iran Gas Engineering and Development Company/IRA Lead partner in a JV E & P
Supervision of KERMANSHAH'S gas Transmission and Network project National Iranian Gas Company/IRAN Consultant

The Fifth Iranian Gas Trunk-Line (IGAT-V)