|
|
|
Synchronization of the first Gas Unit of Zanjan Aryan Combined Cycle Power Plant
|
|
The first unit of Aryan Zanjan power plant synchronized with the national power grid .Minister of Energy during a visit to Aryan Zanjan power plant said that the first gas unit of the power plant with capacity of 183MW synchronized to the national power grid. Total capacity of the power plant is 546MW and the whole power plant consists of two 183MW gas units and one180MW steam unit .The Minister added that total capacity of all thermal power plants of Iran with synchronization of the first gas unit of Aryan Zanjan power plant has reached to 71000MW.
GNEC is responsible for all engineering consultancy and construction supervisory services in the project.
|
|
Print
|
|
|