|
Assignment name :
|
O&M supervisory of West ethylene pipeline |
|
Specifications :
|
West ethylene pipeline carries ethylene from south to north of Iran. Alongside near 1600Km, There are 5 stations to compress the fluid. Fifteen refineries which are located at south and west of Iran, are fed by this pipeline.GNEC is the O& M consultant and supervisor. |
|
Role on the assignment:
|
consultancy & supervision |
|
Client:
|
National Iranian petrochemical co. Iran |
|
|
|
|
|
|
|
|